With a planned opening in spring 2016, this state-of-the-art facility is part of a massive redevelopment programme that will transform the Elephant and Castle area of London.
The £18.5m leisure centre, to be called the Castle, will be a fantastic asset to the local community, providing top-quality leisure facilities, which include a six-lane swimming pool, a learner pool with a movable floor, and a sauna with steam room facilities.
With over a hundred years of experience in constructing vital infrastructure, Balfour Beatty were selected to redevelop the new leisure centre, with the help from tiling subcontractor Elite Tiling Ltd, and ARDEX tiling products, which were used extensively on the 4000m2 project.
ARDEX MICROTEC X 77 Tile Adhesive was used on almost every part of the leisure centre, the pools, steam rooms, the atrium, staircases, and the waiting hubs on the 1st and 2nd floors. It was selected not only because it is ideal for ceramic tiling, but also because of its long open time of up to 60 minutes. This meant that the tilers could spread larger areas of adhesive in a single application, enabling them to work more efficiently, and allowing more time when tiling awkward areas, or cutting around fixtures and fittings in the pool and pool surrounds.
ARDEX EG 8 Cement/Hybrid Tile Grout has the chemical resistance associated with an epoxy-based grout, and, the ease of application of a cement-based grout. It’s versatile and easy to use, which meant it could be used for everything from the foot ledges in the swimming pools to the walls in the shower areas. John Oliver, ARDEX Area Sales Manager, commented “This project involved a large number of wet areas, so we needed to select products that were not only strong and durable, but were also waterproof. ARDEX EG 8 was ideal for the pools and showers, and Elite Tiling Ltd were very happy with the ease of application”.
“For the same reason, we also specified ARDEX-FLEX FL, a Rapid-Setting, Water-Repellent Tile Grout, for all the walls and floors of the wet areas, and ARDEX WPC Waterproof Coating for tanking the wall and floor areas in the showers and other wet areas.”
John concluded: “ARDEX products were used extensively throughout the leisure centre, and performed to the highest standard. The depth of our product range also helped solve a few issues that emerged during the redevelopment: for example, ARDEX P 82 Two Part Epoxy Primer was used as primer for the metal staircases after we realised that it was required to enable the correct substrate for fixing the tiles.”
More projects in 休閒類別
-
格拉斯哥俱樂部翻新工程
-
The Savoy Hotel
The ARDEX range of tile fixing products exceeded expectations
-
倫敦水上奧運中心
A fitting legacy from the 2012 London Olympics
-
Dundee新奧運泳池
Old Olympia Centre replaced with state of the art facility
-
英國聯邦運動會館
It’s a ‘Race to the Finish@
-
Odeon電影院改裝
3 nights to complete and zero downtime
-
Gleneagles高球休閒SPA會館
£5m renovation against the clock
-
ARDEX Helps the Heroes with Recovery Centre Refurb
ARDEX resurfaces state of the art gym complex
-
象與城堡休閒中心
ARDEX help transform the Elephant and Castle area of London
-
Stratford公園休閒泳池中心
1000m² of tiling needing replacing at this 40 year old lesiure centre
-
Duxford 航空博物館
ARDITEX NA reduces the need for intensive preparation and priming, saving time and money
-
Ransome’s Dock Apartments
ARDEX helped turn an industrial warehouse on the Thames to luxury apartments of the highest specification
-
西敏寺聖喬治禮拜堂
18th century architecture meets 21st century art & technology
-
David Lloyd SPA休閒會館翻新
Refurbishing Europe’s premier health & fitness provider
-
金斯頓運動場
ARDEX assist in an extensive refurbishment to the main foyer and reception area