Having completed many prestigious leisure installations, ARDEX were delighted to work in partnership with specialist tiling contractor, W B Simpson Limited, and supply the ideal tile fixing system to assist with the completion of the iconic Aquatics Centre at the Olympic Park, London.
The Aquatics Centre was designed by the internationally acclaimed architect Zaha Hadid, who worked in conjunction with leading swimming pool architects, S & P. The breath taking 17,500 seat Aquatics Centre forms part of the gateway to the Olympic Park, and is housed beneath a distinctive wave-like curved roof. The centre houses a 50m competition pool, a 50m warm up pool, and a 25m competition diving pool, with a ‘dry’ warm-up area for divers. The project required a proven tiling solution which could help deliver fast track completion, as well as the ability to withstand the challenging environment and rigorous hygiene demands.
As with previous high profile projects, including Heathrow Airport, Kings Cross St Pancras Station, Harrods and London Zoo, it was the proven performance and versatility of ARDEX products that won favour with the contractor. In addition, the ARDEX Business Development and Technical Services teams provided on-going support at every stage of the project, from rapid response to specification writing, to installation visits and on-site testing. ARDEX’s purpose-built training facility enabled them to bring together all parties involved in the specification, from the client through to the main contractor, ensuring total confidence in the specification, and subsequent on-site application.
Once the main construction of the Aquatics Centre had been completed, the different depth ‘falls’ of the pool surround were levelled with an application of ARDEX S 21, a Rapid Drying Floor Tile Bedding Mortar which allowed further work to commence after only 3 hours.
Prior to fixing the pool surround tiles, ARDEX S 7 was applied to provide a waterproof coating, eliminating the risk of leaks, or water damage to the mechanical and electrical equipment under the pool surround.
One of the key influences in ARDEX winning this prestigious project was the fact that ARDEX X 77 MICROTEC Flexible Floor & Wall Tile Adhesive was suitable for fixing all of the tiles in the Aquatic Centre. By using just one tile adhesive, cost savings and application time was saved. ARDEX MICROTEC X 77 has an open time of up to 60 minutes, which means you can spread larger areas of adhesive in a single application, enabling the team at the Aquatic Centre installation to work more efficiently, and allowing more time when tiling awkward areas, or cutting around fixtures and fittings in the pool and pool surrounds.
The tiling installation for the Aquatics Centre was vast, with 866,000 ceramic tiles installed in the pools, poolside and changing rooms, (180,000 lining the pools themselves). The main pool tiles were supplied by Spectile Ltd of Crewe. ARDEX-FLEX FL Rapid Setting Flexible Grout in Dove Grey was chosen to fill the pool tile joints, to complete the installation. ARDEX colour test every batch of tile grout, and the advanced manufacturing process ensures uniform colour distribution of the grout powder which eliminates ‘streaking’ during mixing. In addition to offering a colour palette of 35 colours, ARDEX-FLEX Tile Grouts incorporate flexibility, water and dirt resistance, and ease of application, which combined to ensure the perfect finish for the Aquatics Centre.
In addition to the tiling system installed throughout the pools, the shower areas within the changing rooms were prepared with ARDEX WPC, which provided a rapid drying waterproof protection coat. It was essential to ensure that the tiled background was protected from moisture ingress, which can result in leaks to other areas within the changing rooms, or loss of adhesion between the tiles and substrate. ARDEX WPC is quick and easy to apply, and helped to minimise downtime, as tile fixing can commence after just 90 minutes.
Andrew Reid, ARDEX National Business Development Manager commented, “The Aquatics Centre is an amazing facility, and one that will benefit the local community for years to come. Our tiling systems have been specified in many leisure projects, but to win the contract for the Aquatics Centre has been a great achievement, and a testimony to ARDEX’s ‘gold standard’ product range and support. The feedback from the installation team was extremely positive, and the completed venue is truly stunning.”
Products used for this project
-
ARDEX S 7 PLUS
Flexible Waterproof Coating
- Waterproof swimming pools prior to tiling
- Resists water pressures up to 5 Bar
-
ARDEX X 77
微纖增強曲折性重磚膠
- 德國科技微纖維3D增強配方
- 抗剪強度加強/黏結強度提升/耐應變
-
ARDEX S 21
Rapid Hardening Floor Tile Bedding Mortar
- Ideal for solid bed fixing large format tiles and natural stone
- Walk on and grout tiles after 3 hours
-
ARDEX-FLEX FL
曲折型速型瓷磚填縫劑
- 施作後90分鐘可步行
- 35色可供選擇
-
ARDEX WPC
曲折型快乾防水保護膜
- 適合填洞、補縫及其他一般應用
- 90分鐘後可舖磚
More projects in 休閒類別
-
格拉斯哥俱樂部翻新工程
-
The Savoy Hotel
The ARDEX range of tile fixing products exceeded expectations
-
倫敦水上奧運中心
A fitting legacy from the 2012 London Olympics
-
Dundee新奧運泳池
Old Olympia Centre replaced with state of the art facility
-
英國聯邦運動會館
It’s a ‘Race to the Finish@
-
Odeon電影院改裝
3 nights to complete and zero downtime
-
Gleneagles高球休閒SPA會館
£5m renovation against the clock
-
ARDEX Helps the Heroes with Recovery Centre Refurb
ARDEX resurfaces state of the art gym complex
-
象與城堡休閒中心
ARDEX help transform the Elephant and Castle area of London
-
Stratford公園休閒泳池中心
1000m² of tiling needing replacing at this 40 year old lesiure centre
-
Duxford 航空博物館
ARDITEX NA reduces the need for intensive preparation and priming, saving time and money
-
Ransome’s Dock Apartments
ARDEX helped turn an industrial warehouse on the Thames to luxury apartments of the highest specification
-
西敏寺聖喬治禮拜堂
18th century architecture meets 21st century art & technology
-
David Lloyd SPA休閒會館翻新
Refurbishing Europe’s premier health & fitness provider
-
金斯頓運動場
ARDEX assist in an extensive refurbishment to the main foyer and reception area