The KCOM Stadium is a multi-purpose facility in the city of Kingston upon Hull, and was completed in 2002 following a £44 million build. The stadium is home to both Hull City Football Club and Hull Rugby League Club, and in spring 2016 the 170m² main foyer and reception area underwent an extensive refurbishment.
The condition of the floor required the existing ceramic tiles to be removed prior to levelling with ARDITEX NA, which offered a fast track solution to the project by allowing subsequent tiling to commence after just three hours.
The new 400 x 600mm ceramic tiles where then fixed with ARDEX MICROTEC X 78 S Tile Adhesive. The rapid drying properties of this product meant the contractor, Tony Saxby of TST Installations, was able to walk on and grout the tiles after just 90 minutes, and the semi-pourable consistency facilitated solid bed fixing.
ARDEX FLEX-FL Rapid Setting and Hardening Flexible Tile Grout in Silver Shimmer provided the perfect finish to the project, and Kevin Gale, ARDEX Area Sales Manager, commented “The system specified for this project was ideal for the quick turnaround that was needed. If the tiles on the original floor had been sound and well adhered, ARDITEX NA could have gone directly over them without priming; but in this situation, the tiles had to be removed and ARDITEX NA was used to pre-smooth the floor prior to tiling.”
Products used for this project
-
ARDEX MICROTEC X 78 S
Flexible Ultra Rapid Setting Semi-Pourable Floor Tile Adhesive
- Semi-pourable consistency ideal for solid bed fixing large format floor tiles
- Tiles can be trafficked and grouted 90 minutes after fixing
-
ARDEX-FLEX FL
曲折型速型瓷磚填縫劑
- 施作後90分鐘可步行
- 35色可供選擇
-
ARDITEX NA
超快乾乳膠底層自平材
- 無需底塗,絕佳的黏著性就能與幾乎所有材質對接
- 不反潮
More projects in 休閒類別
-
格拉斯哥俱樂部翻新工程
-
The Savoy Hotel
The ARDEX range of tile fixing products exceeded expectations
-
倫敦水上奧運中心
A fitting legacy from the 2012 London Olympics
-
Dundee新奧運泳池
Old Olympia Centre replaced with state of the art facility
-
英國聯邦運動會館
It’s a ‘Race to the Finish@
-
Odeon電影院改裝
3 nights to complete and zero downtime
-
Gleneagles高球休閒SPA會館
£5m renovation against the clock
-
ARDEX Helps the Heroes with Recovery Centre Refurb
ARDEX resurfaces state of the art gym complex
-
象與城堡休閒中心
ARDEX help transform the Elephant and Castle area of London
-
Stratford公園休閒泳池中心
1000m² of tiling needing replacing at this 40 year old lesiure centre
-
Duxford 航空博物館
ARDITEX NA reduces the need for intensive preparation and priming, saving time and money
-
Ransome’s Dock Apartments
ARDEX helped turn an industrial warehouse on the Thames to luxury apartments of the highest specification
-
西敏寺聖喬治禮拜堂
18th century architecture meets 21st century art & technology
-
David Lloyd SPA休閒會館翻新
Refurbishing Europe’s premier health & fitness provider
-
金斯頓運動場
ARDEX assist in an extensive refurbishment to the main foyer and reception area