Stratford公園休閒泳池中心
At 40 years old, the Stratford Park Leisure Centre was in need of refurbishment, so in 2015, Stratford District Council and Sports and Leisure Management Ltd invested £5million to improve the centre’s facilities and create a first class building for the town.
The second phase of this upgrade included renovation works on the main 33 metre swimming pool, as well as the shallow teaching pool, where 1000m² of tiling had to be removed and replaced. In conjunction with Cheshire Wellness, specialist tiling contractor W B Simpson & Sons (Midlands) Ltd were appointed to carry out the works; and opted to use an extensive range of ARDEX products throughout the installation.
Adam Willmott, Business Development Manager at ARDEX UK, specified the system of ARDEX products and said “When we conducted our first site visit to assess the work required, we saw the pool tank had been left with a very rough and uneven surface after the exiting tiles and render had been removed. This meant that we needed a system for rendering, waterproofing and tiling. In addition, due to the time constraints the contractors were under, a fast track solution was required, so our specification included products which minimised drying times and allowed the subsequent stages to commence as quickly as possible.”
“We also needed a separate system for installing the Bamberg Channels, which involved screeding the base of the channels and backfilling them. Using ARDEX S 21, the contractors were able to screed in shallow depths and quickly move on to fixing the channel blocks. “
Anthony Parrott, Director at W B Simpson & Sons (Midlands) Ltd, commented “We have been using ARDEX products for 25 years, and have worked with them on a number of swimming pool projects. We have always had a good experience with both their products and their technical support and, as a result, we decided to choose them again for this project. In addition, the client requested a fast turnaround, so they could re-open the pool to the public as soon as possible – so we were under pressure to finish quickly. ARDEX fast-track products helped us to do that.”
Products used for this project
-
ARDEX AM 100
Rapid Hardening One Coat Tiling Render
- 快速硬化 – 瓷磚可在2小時後安裝
- 單次施作2~20mm
-
ARDEX X 77
微纖增強曲折性重磚膠
- 德國科技微纖維3D增強配方
- 抗剪強度加強/黏結強度提升/耐應變
-
ARDEX S 7 PLUS
Flexible Waterproof Coating
- Waterproof swimming pools prior to tiling
- Resists water pressures up to 5 Bar
-
ARDEX S 21
Rapid Hardening Floor Tile Bedding Mortar
- Ideal for solid bed fixing large format tiles and natural stone
- Walk on and grout tiles after 3 hours
-
ARDEX EG 8 PLUS
環氧瓷磚膠及黏著劑
- 適用於1~6mm 磚縫
- 施作簡易 無需特殊工具
-
ARDEX-FLEX FL
曲折型速型瓷磚填縫劑
- 施作後90分鐘可步行
- 35色可供選擇
More projects in 休閒類別
-
格拉斯哥俱樂部翻新工程
-
The Savoy Hotel
The ARDEX range of tile fixing products exceeded expectations
-
倫敦水上奧運中心
A fitting legacy from the 2012 London Olympics
-
Dundee新奧運泳池
Old Olympia Centre replaced with state of the art facility
-
英國聯邦運動會館
It’s a ‘Race to the Finish@
-
Odeon電影院改裝
3 nights to complete and zero downtime
-
Gleneagles高球休閒SPA會館
£5m renovation against the clock
-
ARDEX Helps the Heroes with Recovery Centre Refurb
ARDEX resurfaces state of the art gym complex
-
象與城堡休閒中心
ARDEX help transform the Elephant and Castle area of London
-
Stratford公園休閒泳池中心
1000m² of tiling needing replacing at this 40 year old lesiure centre
-
Duxford 航空博物館
ARDITEX NA reduces the need for intensive preparation and priming, saving time and money
-
Ransome’s Dock Apartments
ARDEX helped turn an industrial warehouse on the Thames to luxury apartments of the highest specification
-
西敏寺聖喬治禮拜堂
18th century architecture meets 21st century art & technology
-
David Lloyd SPA休閒會館翻新
Refurbishing Europe’s premier health & fitness provider
-
金斯頓運動場
ARDEX assist in an extensive refurbishment to the main foyer and reception area