The Savoy Hotel
ARDEX UK were delighted to work in partnership with Mega Marble Limited, one of the UK’s leading specialist fabricators and installers of Natural Stone and Quartz, to assist with the completion of the vast £220m restoration of London’s iconic Savoy hotel.
Managed by Fairmont Hotels and Resorts, the 268-room property on the Strand boasts nine signature suites and a newly created two-bedroom Royal Suite. Gordon Ramsay has returned to the Savoy Grill and the hotel’s banqueting rooms are already hosting events for up to 400 guests. Additional reception space is available in the new Beaufort Bar for up to 150 guests.
Mega Marble sourced, fabricated and installed a selection of their luxury marble and stonework throughout the public areas within the hotel, including the River Restaurant, Beaufort Bar, Thames Foyer, Upper Thames Foyer, Front Hall, Reading Room, Cloakrooms and lift cars.
To commence this prestigious project, ARDEX A 35 Ultra Rapid Drying Cement was used to screed the floor areas. ARDEX A 35 can be walked on after only 3 hours and is dry enough to receive floor finishes after just 24 hours, regardless of thickness. A wait of at least a month would have been required before a standard cement/sand screed would be hard and dry enough for further work to proceed.
ARDEX X 7001 Rapid Drying Pourable Floor Tile Adhesive in white was used to fix the floor tiles – incorporating ARDEX’s unique ‘RAPDRY FORMULA TECHNOLOGY’ it virtually eliminates the possibility of staining in moisture sensitive natural stone. ARDEX X 7001 has a pourable consistency that facilitates solid bed fixing, and can be walked on and grouted just two hours after fixing.
One such area where ARDEX X 7001 was used to great effect in this project was the famous Front Hall, which has been spectacularly renewed to its former glory with a newly laid, intricate design of black and white marble tiles, co-ordinating with columns clad in the same material. The installation continued under a 4 metre arch of Carrara marble leading down stairs, with marble panelling in the same material, through to The Upper Thames Foyer. Mega Marble’s work continues through the Thames Foyer to the famous River Restaurant where sparkling walls in Star Galaxy granite, and diamond patterned floors in Crema Marfil and Star Galaxy granite are simply stunning. ARDEX S 16 White Rapid Hardening and Drying Natural Stone Tile Adhesive with ARDEX E 90 Admix was used to fix the wall tiles, and once again incorporates RAPIDRY FORUMLA TECHNOLOGY to eliminate the risk of water staining.
Commenting on the project, Rafi Mimoni of Mega Marble said, “We work in many of the UKs most prestigious hotels, and our luxury marble and stonework products demand the very best in terms of adhesives. ARDEX have developed a range of tile fixing products that exceed expectations, and enable us to maintain our reputation for excellence. We were delighted with the results at The Savoy”.
Products used for this project
-
ARDEX A 35 (期貨/進口品)
超快乾整平砂漿
- 快速硬化、3小時可步行
- 不論厚度,24小時後可做後續覆蓋作業
-
ARDEX S 16 (期貨/進口品)
快凝石材黏著劑 - 牆面及地面用
- 2至3小時後可步行及施作填縫劑
- 有效減少天然石材可能的水氣滲透及白華的產生
-
ARDEX MICROTEC X 7001
Flexible Rapid Drying Pourable Floor Tile Adhesive
- Pourable consistency ideal for solid bed fixing large format floor tiles
- Ideal for tiling onto wood-based sheets and boards
More projects in 休閒類別
-
格拉斯哥俱樂部翻新工程
-
The Savoy Hotel
The ARDEX range of tile fixing products exceeded expectations
-
倫敦水上奧運中心
A fitting legacy from the 2012 London Olympics
-
Dundee新奧運泳池
Old Olympia Centre replaced with state of the art facility
-
英國聯邦運動會館
It’s a ‘Race to the Finish@
-
Odeon電影院改裝
3 nights to complete and zero downtime
-
Gleneagles高球休閒SPA會館
£5m renovation against the clock
-
ARDEX Helps the Heroes with Recovery Centre Refurb
ARDEX resurfaces state of the art gym complex
-
象與城堡休閒中心
ARDEX help transform the Elephant and Castle area of London
-
Stratford公園休閒泳池中心
1000m² of tiling needing replacing at this 40 year old lesiure centre
-
Duxford 航空博物館
ARDITEX NA reduces the need for intensive preparation and priming, saving time and money
-
Ransome’s Dock Apartments
ARDEX helped turn an industrial warehouse on the Thames to luxury apartments of the highest specification
-
西敏寺聖喬治禮拜堂
18th century architecture meets 21st century art & technology
-
David Lloyd SPA休閒會館翻新
Refurbishing Europe’s premier health & fitness provider
-
金斯頓運動場
ARDEX assist in an extensive refurbishment to the main foyer and reception area